However when a wood subfloor is used you must account for possible expansion and contraction of the subfloor.
Engineered flooring acclimation period.
Some engineered flooring manufacturers recommend acclimation while others do not.
When discussing delivery and installation dates with clients they are almost always under the impression that the wood flooring must sit in their home before installation.
The period within which you will acclimate your floor depends on various factors such as the material of your ideal flooring geographic location current temperatures and humidity and expected climate changes.
The planks can remain in the box with the ends cut open for the duration of the acclimation period.
Duchateau recommends an acclimation period of 3 days for all our engineered hardwood flooring products.
Even with engineered flooring it is suggested by some manufacturers that in order to retain coverage with the warranty the job site has to be maintained between 30 50 relative humidity and these conditions must also be maintained after installation.
Wood floor acclimation with engineered flooring.
Maintaining the recommended acclimation levels after the installation will minimize board movement excessive squeaks and gaps.
I inspect a lot of flooring complaints and fill out a lot of manufacturer required forms.
While it s not as important for our engineered hardwoods due to the stability in the way they are constructed solids will expand and contract considerably given the right conditions with wide changes in relative humidity levels.
All vinyl plank flooring has a high density fie core which is porous even when it looks solid.
This is an.
Handle and unload hardwood flooring with care and store within the environmentally controlled site in which it is expected to perform.
Best practices for acclimating wood flooring.
Engineered hardwood wood subfloor engineered hardwood is more dimensionally stable than solid so it doesn t usually need to be acclimated to the same extent as solid hardwood.
Allow wood flooring to acclimate for at least three days.
Acclimation to the installation environment for solid wood floors should never be overlooked.
Proper job site conditions acclimation and moisture testing the subfloor and new flooring and all work together for the success of the installation.
The only way to achieve this is through acclimation.
Yes since engineered wood flooring is constructed from natural hardwood it requires acclimation.
We ve all heard someone in the flooring industry say the wood flooring must sit in the home to acclimate for a period of time before installation.
3 days of acclimation is recommended for engineered flooring.
If the manufacturer recommends the wood flooring be acclimated before installation proceed as follows.
Acclimation hardwood floors how long.