While some products are designed for glue down application as is often used when installing flooring over a concrete slab this is typically a job for a contractor.
Engineered wood floor laying.
Before installing a floating engineered hardwood floor follow the same preparation steps mentioned above including underlayment and laying out spacers to maintain the expansion gap specified by the manufacturer.
Prep the planks for installation.
Put the first board up against the mason s line with the groove side facing away from the walls.
This is a great asset to the look of the floor when the variations are consistently distributed across the space.
If you are acclimatising engineered wood flooring for under floor heating we recommend laying each box individually on the ground.
Installing hardwood floor opening hardwood floor prep planks.
With any wood product there will be natural color variations from piece to piece.
Start the heating system at a low but comfortable heat setting and increase it by 2 deg every 2 days working it gradually up to the highest setting.
A concern with engineered flooring however is.
Installing a floating engineered hardwood floor.
Use 1 2 inch spacers to assist in maintaining the 1 2 inch expansion gap between the first row of flooring planks and the wall.